ECS2000C ENERGY CONVERTING SYSTEM

n SPECIFICATION

  • Power Consumption: < 10KWH, 220V 3Phase
  • Startup Diesel Oil Consumption: < 150L/2hr.
  • Water Consumption: 100L/hr
  • Processing Rate: 1.5T/hr ~ 3T/hr
  • First Stage Operating Temperature: 150C~ 450C, Adjustable
  • Second Stage Operating Temperature: 450C ~850C, Adjustable
  • Max Condenser Processing Rate: 3000CMH
  • Max Chamber Volume of Reactor: 2.8m3
  • Max Size of Loading: D=300mm
  • Dimension (L X W X H): 12m x 2.3m x 2.3m

n FEATURE

  • Two stages of steam pyrolysis function in one system.
  • Automatic temperature control
  • Max operating temperature in second pyrolysis is up to 850℃
  • Any kind of organic waste can be treated.
  • Continuous process system . Max processing rate is up to 4ton/hr, depend on the size and density of the raw material.
  • System including high performance fuel gas cleaning without second air pollution
  • High efficiency energy recovery is up to 90%. The lowest energy cost.
  • High safety system without explosive consideration.
  • High quality of by-products compared with any other pyrolysis systems.
  • Low maintenance cost. Fully integration system with auto-cleaning function. 
  • Modular system. It is easy to install without large land space or factory restructured.