ECS2000C ENERGY CONVERTING SYSTEM
n
SPECIFICATION
Power Consumption: < 10KWH, 220V 3Phase
Startup Diesel Oil Consumption: < 150L/2hr.
Water Consumption: 100L/hr
Processing Rate: 1.5T/hr ~ 3T/hr
First Stage Operating Temperature: 150C~ 450C, Adjustable
Second Stage Operating Temperature: 450C ~850C, Adjustable
Max Condenser Processing Rate: 3000CMH
Max Chamber Volume of Reactor: 2.8m
3
Max Size of Loading: D=300mm
Dimension (L X W X H): 12m x 2.3m x 2.3m
n
FEATURE
Two stages of steam pyrolysis function in one system.
Automatic temperature control
Max operating temperature in second pyrolysis is up to 850℃
Any kind of organic waste can be treated.
Continuous process system . Max processing rate is up to 4ton/hr, depend on the size and density of the raw material.
System including high performance fuel gas cleaning without second air pollution
High efficiency energy recovery is up to 90%. The lowest energy cost.
High safety system without explosive consideration.
High quality of by-products compared with any other pyrolysis systems.
Low maintenance cost. Fully integration system with auto-cleaning function.
Modular system. It is easy to install without large land space or factory restructured.